(+91) 8446053180
Careers
Training
Services
Reality Capture & CAD Services
Laser Scanning & Photogrammetry
Digital Twin Technology in Reality Capture
BIM Services
CAD Services
Industrial Engineering Services
Time and Motion Study Consulting
Lean Manufacturing Consulting
Layout & Material Flow Services
Operational Excellence Consulting
Industrial Engineering Integration with Simulation Service
Simulation Modeling Services
Discrete Event Simulation
Agent Based Simulation Modeling
Advanced Manufacturing Engineering Services
Jig and Fixture Design
Body in White Jig and Fixture Design
Steel Detailing Services
GIS Services
Advanced Software
Training Courses
Market Solutions
Architecture, Engineering, & Construction
Automotive
Aerospace
Manufacturing
Warehouse & Logistics
Smart Cities
Food & Beverage
Healthcare
Laser Scanning for the Marine Industry
About Us
Resources
Blog
Case Studies
Projects
White Papers
Contact
Services
[Tabs]
Reality Capture & CAD Services
[Tabs]
Laser Scanning & Photogrammetry
Digital Twin Technology in Reality Capture
BIM Services
CAD Services
Industrial Engineering Services
[Tabs]
Time and Motion Study Consulting
Lean Manufacturing Consulting
Layout & Material Flow Services
Operational Excellence Consulting
Industrial Engineering Integration with Simulation Service
Simulation Modeling Services
[Tabs]
Discrete Event Simulation
Agent Based Simulation Modeling
Advanced Manufacturing Engineering Services
[Tabs]
Jig and Fixture Design
Steel Detailing Services
GIS Services
Advanced Software
Training Courses
Market Solutions
[Column]
Architecture, Engineering, & Construction
Automotive
Aerospace
Manufacturing
[Column]
Warehouse & Logistics
Smart Cities
Food & Beverage
Healthcare
Laser Scanning for the Marine Industry
About Us
Resources
[Column]
Blog
Case Studies
Projects
Contact
Request a Quote
✕
Case Studies
Portfolio
Case Studies
Filter by
Categories
Show all
All
Case Studies
Projects
White Papers
As-Built Conversion Point Cloud to 3D (Assembly Section)
Read more
As-Built Conversion Point Cloud to 3D (Assembly Section)
0
Date
February 1, 2024
Work Content Estimation – Engine Shop
Read more
Work Content Estimation – Engine Shop
0
Date
February 1, 2024
Work Content Estimation – New Model Launch
Read more
Work Content Estimation – New Model Launch
0
Date
February 1, 2024
Work Content Estimation – Mold shop
Read more
Work Content Estimation – Mold shop
0
Date
February 1, 2024
Work Content Estimation – Multi-Model Assembly Line
Read more
Work Content Estimation – Multi-Model Assembly Line
0
Date
February 1, 2024
Work Content Estimation and Manpower Optimization (Marketing Operations)
Read more
Work Content Estimation and Manpower Optimization (Marketing Operations)
0
Date
February 1, 2024
Work Content Estimation and Manpower Optimization (Indirect areas)
Read more
Work Content Estimation and Manpower Optimization (Indirect areas)
0
Date
February 1, 2024
Work Content Estimation & Manpower Calculation (Stores Operations)
Read more
Work Content Estimation & Manpower Calculation (Stores Operations)
0
Date
February 1, 2024
Resource Utilization-Production Study-Loss Time Analysis
Read more
Resource Utilization-Production Study-Loss Time Analysis
0
Date
February 1, 2024
Capacity Utilization – Production study – Loss Time Analysis
Read more
Capacity Utilization – Production study – Loss Time Analysis
0
Date
February 1, 2024
Resource Requirement Validation in a Service Sector
Read more
Resource Requirement Validation in a Service Sector
0
Date
January 31, 2024
Warehouse Simulation – Validate Process Flow and Work Processes
Read more
Warehouse Simulation – Validate Process Flow and Work Processes
0
Date
January 31, 2024
Predict & Reduce Traffic Congestion in Plant Premises
Read more
Predict & Reduce Traffic Congestion in Plant Premises
0
Date
January 31, 2024
Capacity Planning in “Build to Order” Sunglass Manufacturing Industry
Read more
Capacity Planning in “Build to Order” Sunglass Manufacturing Industry
0
Date
January 31, 2024
Greenfield Facility – Throughput Validation and Improvement
Read more
Greenfield Facility – Throughput Validation and Improvement
0
Date
January 31, 2024
Study for Validating the Plan of a New Steel Processing Plant Setup
Read more
Study for Validating the Plan of a New Steel Processing Plant Setup
0
Date
January 31, 2024
Validating a New Hospital Building Master Plan
Read more
Validating a New Hospital Building Master Plan
0
Date
January 31, 2024
Use of Simulation as safe platform to test new strategies in Fuel Cell Manufacturing
Read more
Use of Simulation as safe platform to test new strategies in Fuel Cell Manufacturing
0
Date
January 31, 2024
Cylinder Block Machining Line – Throughput Improvement
Read more
Cylinder Block Machining Line – Throughput Improvement
0
Date
January 31, 2024
Capacity Validation Study – TCF
Read more
Capacity Validation Study – TCF
0
Date
January 31, 2024
Prev page
1
2
3
4
Next page