Material Movement Study – Blanking & Stamping

January 31, 2024

Material Movement Study – Blanking & Stamping


author-image

mbawankar |

AUTOMOTIVE INDUSTRYMaterial Movement Study

Material Movement Study - Blanking & Stamping

Key Points

  • Greenfield facility: MHE requirements
    & congestion analysis

Client's Challenge

  • Ensure blanking & stamping does not constrain production at body shop
  • Optimize MHE requirements
  • Analyze impact of crane movement on changeover time &
    throughput

PMI's Approach

  • Analysis of Data and Verification of Baseline Model
  • Understand impact of:
    1. Number of forklifts
    2. Die Changeover time at Blanking Line; on throughput
  • Capture impact of material movement congestion

Findings & Recommendation

  • Drops in production due to congestion of forklifts at
    Stamping Storage area
  • Under-utilized forklifts at end of Blanking line
  • Reduced congestion by proposing that forklifts carry 2
    pallets/trip
  • 30% reduction in MHE requirment by eliminating underutilized forklifts
  • Identified 30 minutes as maximum allowable changeover
    time at Blanking

Let our experts show you how our Services can support your projects!

Send a message to our team by filling out the form below. Describe your project, ask questions, or even request a bid.
An expert from our team will be in touch with you within one business day!

Want to schedule a time to speak with one of our  representatives NOW?

    Reality Capture & CAD ServicesIndustrial Engineering ServicesSimulation Modeling ServicesSafety & Quality ManagementGIS Consulting ServicesJig & Fixture DesignSteel Detailing ServicesAdvanced SoftwareTrainingOther

    EmailGoogle SearchBingWord of MouthSocial MediaEventReferralOther

    author-img
    mbawankar

    You may also like

    Consult an Expert

      Reach out to our representatives!