The expansion was planned to increase the Paint Shop capacity 1.5 times the existing capacity. Given the complexity of the Paint Shop system, the client wanted to conduct a simulation study to determine whether the proposed expansion can indeed increase the Paint Shop capacity as desired.
The first bottleneck in the system was due to an operation rule near the end of an oven
We found that the repair percentages after polishing operation were high and caused loss in throughput
We found that in order to maintain target production, the model mix limits to be followed for producing its 4 variants