A leading global automotive company wanted to check the feasibility of their power and free conveyor system after introducing a lineup of new vehicles and find out ways to improve their system.

Key Points

  • To validate throughput from the system
  • Identify the Bottleneck in the system
  • Provide recommendations to alleviate the same

Client's Challenge

  • Check feasibility of the system to meet target production with new model mixes
  • Identify and alleviate any bottlenecks in the conveyor system
  • Study the impact of system output on the percentage of  vehicles that are loaded on the conveyor system

PMI's Approach

  • We modeled the conveyor system in 3D using Tecnomatix Plant Simulation
  • Operating rules for loading and carrier routing in the system were defined and improved through simulation
  • System throughput, time-in-state graphs, number of vehicles in the system were tracked

Simulation Study of a Power and Free Conveyor System for a Leading Vehicle Manufacturer

Finding & Recommendations

We found that the target was not achieved even when only 20% of the vehicles were loaded on the system

Lack of hangers at one of the loading stations lead to filling up of buffer and causing blockage at a production shop

  • Relocating a portion of another underutilized buffer helped achieve throughput when 40 to 80 % of the vehicles were loaded onto the conveyor

A paint shop system where vehicles are unloaded from the conveyor system was running at its full capacity

  • Installation or expanding the existing paint shop would allow the conveyor system to handle 100% of the vehicle being loaded

Production per day at vehicle manufacturing assembly line table graph chart

Let our experts show you how our Services can support your projects!

Send a message to our team by filling out the form below. Describe your project, ask questions, or even request a bid.
An expert from our team will be in touch with you within one business day!

Want to schedule a time to speak with one of our  representatives NOW?

    Reality Capture & CAD ServicesIndustrial Engineering ServicesSimulation Modeling ServicesSafety & Quality ManagementGIS Consulting ServicesJig & Fixture DesignSteel Detailing ServicesAdvanced SoftwareTrainingOther

    EmailGoogle SearchBingWord of MouthSocial MediaEventReferralOther

    Spread the love
    author-img
    mbawankar

    You may also like

    Time and Motion Studies Explained

    Joydeep Chatterjee | December 13, 2023


    Man-Machine Chart: Concept, Use and Benefits

    mbawankar | October 20, 2023


    Time Study Methods in Operations Management

    mbawankar | October 19, 2023


    What is Laser Scanning & Photogrammetry ?

    Joydeep Chatterjee | October 6, 2023


    Consult an Expert

      Reach out to our representatives!